Zhoushan Huafeng Company once again completed the cold LPG ship repair
Release time:2024-01-22 Click:967On the afternoon of December 24, after nearly 15 days of intense construction, a fully cooled LPG ship "DOUBLE IN" slowly left Zhoushan Huafeng No. 2 Wharf. The ship was repaired with a number of low-temperature liquid tube replacement, FH36 low-temperature plate replacement of about 5 tons, repair of various safety valves and liquid cargo valves, and completion of comprehensive overhaul projects such as ballast system new installation and ship special inspection. The ship is 224M long and 36M wide, with a total load of 43,000 tons and a total capacity of 83,000 cubic meters. It is a typical ship for the company to undertake high value-added ship repair.
The ship entered the factory on December 9 and was docking on December 14. During the repair period, the "6S" standardized repair was strictly implemented, and the anti-static, explosion-proof and clean safety management were strictly controlled. The excellent safety control and professional repair were highly appreciated by the shippers, which fully proved that Huafeng Ship fully possessed the ability to repair fully cooled LPG and LNG ships.
During the repair period, there were many days of strong wind and cold weather, the company attached great importance to it, worked together, carried out scientific construction, and completed the repair task safely and efficiently.