"Huafeng Speed" again achieved good results
Release time:2024-01-22 Click:987
At 14:00 on January 15, 2024, a 9-cabin bulk carrier "ARES VENTURE" (299M*50M) slowly left the wharf of Huafeng Ship Daishan Base under the tug of a tugboat.
The ship arrived at Huafeng Ship Daishan Base on the afternoon of January 3, 2024, and the repair mainly involved comprehensive repair projects such as routine special inspection, prefabrication and installation of desulfurization system, and propeller silicone.
Under the concerted efforts of the shipowners, Huafeng team and many friends of the manufacturers and the efforts of the construction personnel all night, the whole team has a clear goal, efficiency is the first, firmly grasp the safety and quality, and achieve a 12-day repair cycle, of which the main desulfurization system only takes 9 days to complete, once again refreshing the Huafeng speed.